Mechanical Engineering Machinery Factory Machinery
Scope of work
1.Design and calculation of steam generator or other steam with a gauge pressure not exceeding 4,000 kilopascals or a production rate of steam or other vapor not exceeding 20,000 kilograms per hour per machine. Pressure vessels of all sizes
2. Work to control the construction or production and consider and inspect machinery with a power not exceeding 2,000 kilowatts per machine. Steam or other vapor generator with a gauge pressure not exceeding 4,000 kilopascals or with a steam or other vapor production rate not exceeding 30,000 kilograms per hour per machine Pressure vessels with a gauge pressure not exceeding 4,000 kPa or a volume not exceeding 30 cubic meters per tank.
3. Work to consider, inspect and facilitate the use of pressure vessels and boilers not exceeding 20 tons of steam.
4. Installation or dismantling or moving of any size.
5. Fire extinguishing and fire protection systems can be made to any size. ISO45001
6.Environmental energy management can be done at any size ISO50001 ISO14001
- Saving heat energy. Cold energy, electrical energy such as boilers, chillers Air compressor
- Real time analysis of electricity usage behavior with AMR (Automatic Meter Reading) system